So, whilst waiting for parts to turn up and paint to dry, I thought I’d make a start on the controls for R2. Simplest would be to just have the drive wheels, dome, and a couple of other bits controlled from a standard hobby RC controller. I’ve got a eight channel one and a few spare receivers so it would’ve been trivial to do that. However, I wanted something a bit more fancy. I’m wanting to have the panels on the dome to be controllable, as well as various controls for the main body panels, arms, fire extinguisher, etc.

My thoughts for this is to use a Raspberry Pi, along with a bunch of peripherals on an i2c bus. Adafruit do a nice i2c 16 channel servo board which a couple of should give enough channels to control everything I want. I will be putting one of these in the dome for all the various flaps, and another in the body for speed controllers and door mechanisms. Using a Pi will give me lots of power for doing controlling the servos and playing sounds, and hopefully I won’t need a real time OS. Future plans will involve voice recognition and maybe even facial recognition!

I’m also wanting to do this as modularly as possible, so to this end my first bit of programming was a daemon to run that listens for commands and sends signals over i2c to the servo controllers. My thinking behind this is that I can write many different interfaces for controls, from a simple web/PHP interface for testing and such like, to another interface to translate bluetooth signals from a PS3 controller. I’ll also be able to write a scripting system to do preset motions.

IMG_0397_CR2_embedded_1

I’ve put the code for my R2 Control software up on github to keep track of changes and such like. If anyone else feels the urge to use it, or even contribute, they are more than welcome to. I’m no programmer, so I may be going down the wrong path for all this, but its a learning experience. The code seems to work pretty well for now, but still needs to be tested in R2. Theres still a couple of things I need to add before I start doing any of the other programs. Currently the servos will move as fast as possible to their new position so I need to add a loop in there to allow different speeds. I also need to add support for multiple i2c addresses. I should have these things coded in fairly soon hopefully, and once my hinges for the dome turn up I can start installing it all and testing.

 

Polishing the dome

The R2 dome that I got actually consists of 2 domes, one to fit inside the other. The outer one comes pre laser cut to make things easier, with all the various panels held on by a small tab of metal. A quick run with a file or fine hacksaw makes them a doddle to remove. Both domes are produced by a method called metal spinning, which means they have ‘spin lines’ running around them. This doesn’t matter for the blank inner dome as it is mostly hidden, but the outer dome needs the lines polishing out of it to get the correct look. This is a lot of work with wet and dry paper, going from a pretty coarse grit, up to some really fine paper.

Starting with the 240 grit and a large bottle of water, giving the dome a good sand down will remove the spin lines and make the surface rough, but even. Moving up through the different grit ratings slowly (very slowly) smooths the surface over until you get to the 3000 grit. The side product of this is silver hands!

IMG_0171_CR2_embedded_1IMG_0176_CR2_embedded_1

It is all a slow and laborious process, but the end results are worth it. Whilst doing this work, the panels removed earlier needed painting, so a load of paper was laid out and the painting begun. I’ve been using Halfords car spray paints, starting with a grey primer to prep the surface, then a coat of Ford crystal blue, followed by Citroen poseidon blue, and finally a coat of laquer to protect it. It seems the trick is to do light coats, with a little bit of sanding in between with something like a 600 grit paper.

IMG_0148_CR2_embedded IMG_0170_CR2_embedded IMG_0179_CR2_embedded_1IMG_0385_CR2_embedded_1

The end results look really good. I applied a little too thick in a few places, but its all a learning experience for me. I’ve just got a little more polishing to do on the dome, and I need to mask off most of it to let me spray the ring around the bottom of it blue. The next stage is to start cutting the inner dome to allow the panels to open and things to come out. I’m a little apprehensive about doing it, but once I’ve started it it will be fine. But for now, a taster of how it will look:

IMG_0392_CR2_embedded_1 IMG_0395_CR2_embedded_1

This is the droid you’re looking for.

Alright, so maybe a bit of a corny title, but I couldn’t resist.

So, at the end of May we had a trip to Milton Keynes for Collectomania. Besides meeting and getting autographs from Robert Llewellyn and Chris Judge, the other highlight was all the R2d2 droids that were running around. There was a whole collection of different astromech droids in varying states of the build process. Once I got home, and of course mentioned it to she who must be obeyed, I started looking at just how difficult these things were to build.

Initially I joined the main R2 builders club, which also has a yahoo group with lots of useful files and blueprints.The benefit of building an R2 over most other large props is the fact that there is such a large community of people who have already found most of the pitfalls. They also do runs of parts that might be beyond another builder’s skills or too expensive to produce in single units. Unfortunately, most of the talk and production is very America centric, but thankfully there is a very active UK builders group which I quickly signed up for.

After a few weeks of reading (and more reading) the forums I decided I would take the plunge. Mostly I will be keeping a picture log on Facebook and Google+, but will also write up occasionally on here.

I thought I’d first start with what I know, electronics. There are a set of PCBs available that handle all the dome lighting and runs from a single Arduino Pro Micro which gives a lot of power and flexibility. So, with the PCBs ordered, I jumped to eBay to get the rest of the components. Obviously, a lot of LEDs were needed so they were first, I needed a pro micro to run the system, and the other main component were MAX7219 chips. Now, if I was to source the chips from the UK they would have been in the order of £9 each. eBay had them for a tenth of that price. These were pretty certainly cheap knock offs, but for that price I could order way more than needed and suffer a few DOA chips.

Of course, it wasn’t that straight forward. I didn’t realise just how close the LEDs were packed on the PCBs which meant I needed flangeless LEDs. Needless to say when I received the LEDs from eBay they had a flange on the dome which meant they would not fit. Hunting around in the forums, I found a possible source of LEDs from China that were definitely flangeless. So, re-order and wait.

Whilst I was waiting for the parts to turn up I hit a bit of luck. Probably the hardest main part to make myself was the dome. There are lots of different options for these, from aluminium to styrene or fibreglass. The runs for these are fairly infrequent, especially if you want a certain type of dome. I’d initially ruled out building my droid in aluminium due to cost and the fact I’ve never worked with metal before, but someone on the UK builders Facebook group mentioned they had a dome and a set of body skins available in aluminium. It was too good an opportunity to miss, so I bit the bullet and bought them. A couple of days later they turned up!

IMG_0136_CR2_embedded

This was scary, this was starting to be a large commitment. It is fun tho, so lets carry on!

 

Solar!

Over the last couple of years I’ve been looking at the feasibility of  getting photovoltaic cells put on the roof of my house. I’ve only got a small amount of roof space seeing as I live in a mid terrace so wasn’t sure if I could get enough panels to make it worth while. A couple of months ago I decided to take the plunge and get a few quotes in. Unfortunately, this is where I met the main hurdle with the whole project. Despite emailing half a dozen companies, I only got two visits to give me a quote, and only one of those actually sent me a quote.

Thankfully I’d done enough research into the technology and rough costs so that I knew the quote I got back was a pretty typical price. The company also seemed to be pretty decent with some good reviews and a good web site. With all that in mind, I decided to go for it and accepted the quote. I was very impressed with how quickly things went. One of the requirements for getting the feed in tariff from the government is to get an Energy Performance Certificate (EPC) and within a few days I’d had the survey done for that and the certificate in my hands. Only a little over a week later the panels were installed, commissioned and my meter was running backwards.

 

Solar install

Solar install

So, what did I actually get installed? All together, 16 panels were squeezed onto my roof across two elevations with 8 on a west facing aspect and then 8 on the south facing which gave me 4kW in total. The installation is fairly straight forward and involves the two arrays of panels going into an inverter which feeds into the main circuit breaker panel. I’ve also installed a full monitoring system that keeps track of power consumed and solar power produced, which I’ll probably write about in another blog post.

The big question however is, is it all worth it? I haven’t been running them for long enough really to give a definitive answer, but from the calculations I’ve done I think the answer is a resounding yes. The feed in tariff is index linked, so will increase over the 20 year lifespan of the panels along with inflation, and it is highly unlikely that the price of electricity is going to go down, all of which means that I should have paid off the panels totally in under 8 years. I can see that number dropping quite a bit too as electric prices increase. Also, the feed in tariff runs for 20 years, but the panels should last even longer than that and are still 80+% efficient after the 20 year mark so should be providing free electricity for many years after the feed in tariff has finished. Over a 20 year period, the initial investment should see a return of over 12% which is so much more than any bank can offer.

If you can afford to get PV installed, I’d definitely recommend it. I’ve already seen a drastic drop in my electric usage and the money is much better installed on my roof than in the bank.